Electricity grids: the backbone of the EU energy system

2025/2006(INI) · Own-initiative procedure

Procedure 2025/2006(INI) (own-initiative procedure) concerns “Electricity grids: the backbone of the EU energy system”; the committee responsible is ITRE (Industry, Research and Energy). Concluded in Parliament: Last voted on 19 Jun 2025: adopted. Parliament held roll-call votes on one day, most recently on 19 Jun 2025 (final vote): adopted with 418 votes in favour, 112 against and 45 abstentions.

Reference
2025/2006(INI)
Type
Own-initiative procedure
Status
Concluded in Parliament
Lead
ITRE Industry, Research and Energy
Rapporteur
Anna Stürgkh (Renew, Austria)
Shadow rapporteurs
Dario Tamburrano (The Left, Italy), Kira Marie Peter-Hansen (Greens/EFA, Denmark), Bruno Tobback (S&D, Belgium), Seán Kelly (EPP, Ireland), Ondřej Krutílek (ECR, Czechia), András Gyürk (PfE, Hungary)

Roll-call votes in Parliament

Timeline

  1. 13 Jan 2025: Appointment of a rapporteur
  2. 23 Jan 2025: Proposal referred to plenary
  3. 24 Feb 2025: Parliamentary committee tabling report
  4. 13 May 2025: Adoption of a report by the EP committee responsible
  5. 18 May 2025: Tabling of a document to European Parliament plenary sitting
  6. 18 Jun 2025: Debates in European Parliament plenary sitting (agenda)

Source: European Parliament, Open Data Portal (procedures, agendas, roll-call votes), CC BY 4.0, prepared by OpenRCV. Procedure file in the Legislative Observatory (OEIL)

Source: European Parliament, Open Data Portal (procedures, agendas, roll-call votes), CC BY 4.0. Names of steps, roles and procedure types from the European Parliament’s vocabulary.