Electricity grids: the backbone of the EU energy system
2025/2006(INI) · Own-initiative procedure
Procedure 2025/2006(INI) (own-initiative procedure) concerns “Electricity grids: the backbone of the EU energy system”; the committee responsible is ITRE (Industry, Research and Energy). Concluded in Parliament: Last voted on 19 Jun 2025: adopted. Parliament held roll-call votes on one day, most recently on 19 Jun 2025 (final vote): adopted with 418 votes in favour, 112 against and 45 abstentions.
- Reference
- 2025/2006(INI)
- Type
- Own-initiative procedure
- Status
- Concluded in Parliament
- Lead
- ITRE Industry, Research and Energy
- Rapporteur
- Anna Stürgkh (Renew, Austria)
- Shadow rapporteurs
- Dario Tamburrano (The Left, Italy), Kira Marie Peter-Hansen (Greens/EFA, Denmark), Bruno Tobback (S&D, Belgium), Seán Kelly (EPP, Ireland), Ondřej Krutílek (ECR, Czechia), András Gyürk (PfE, Hungary)
Roll-call votes in Parliament
- Electricity grids: the backbone of the EU energy system (A10-0091/2025), 19 Jun 2025: final vote, main vote: A10-0091/2025 – Anna Stürgkh – Motion for a resolution (as a whole), adopted, 418 for, 112 against, 45 abstentions; plus 19 more roll-call votes
Timeline
- 13 Jan 2025: Appointment of a rapporteur
- 23 Jan 2025: Proposal referred to plenary
- 24 Feb 2025: Parliamentary committee tabling report
- 13 May 2025: Adoption of a report by the EP committee responsible
- 18 May 2025: Tabling of a document to European Parliament plenary sitting
- 18 Jun 2025: Debates in European Parliament plenary sitting (agenda)
Source: European Parliament, Open Data Portal (procedures, agendas, roll-call votes), CC BY 4.0, prepared by OpenRCV. Procedure file in the Legislative Observatory (OEIL)
Source: European Parliament, Open Data Portal (procedures, agendas, roll-call votes), CC BY 4.0. Names of steps, roles and procedure types from the European Parliament’s vocabulary.